02/29/2024 - Double Wide wood work is done! episode artwork

EPISODE · Mar 1, 2024 · 1H 41M

02/29/2024 - Double Wide wood work is done!

from The Boys of Jarrod’s Place · host Loam Society

Will and Drew wrap up the new wood feature on Double Wide and Will starts working on the exit table. A week of fine finishing work on the final turns, including one of the parks tallest berms, catches the crew up to the bridge drop. We are ready to finish this thing and let ya'll rip! Catch up with all of the crew shenanigans on this weeks episode! Okay, Yeuh! jarrodsplacebikepark.com @TheBoysofJarrodsPlace @Jarrod_Place YouTube

NOW PLAYING

02/29/2024 - Double Wide wood work is done!

0:00 1:41:34

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of The Boys of Jarrod’s Place?

This episode is 1 hour and 41 minutes long.

When was this The Boys of Jarrod’s Place episode published?

This episode was published on March 1, 2024.

What is this episode about?

Will and Drew wrap up the new wood feature on Double Wide and Will starts working on the exit table. A week of fine finishing work on the final turns, including one of the parks tallest berms, catches the crew up to the bridge drop. We are ready to...

Can I download this The Boys of Jarrod’s Place episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!