#22 | Thought Leadership | Digitising data centre construction with augmented reality and ultra-precise positioning episode artwork

EPISODE · Jul 31, 2025 · 39 MIN

#22 | Thought Leadership | Digitising data centre construction with augmented reality and ultra-precise positioning

from The iMasons Innovation Podcast Thought Leadership · host Infrastructure Masons

Innovation Committee Chair and host Romain Tranchant interviews Waleed Zafar.   Waleed Zafar is the Director of Mission Critical at XYZ Reality, a company transforming how mission-critical projects are planned, built, and delivered with its innovative construction delivery platform. With a background in investment banking, Waleed joined XYZ as its first employee, playing a pivotal role in developing the company’s core technology. He then partnered with the largest developers in the construction of data centres, using augmented reality and precise positioning to improve the rate of delivery and health and safety in construction.  ***  Infrastructure Masons (iMasons) is a global, non-profit, professional association of individuals connected and empowered to build a greater digital future for all.  #iMasons #InfrastructureMasons #Innovation #ThoughtLeadership 

NOW PLAYING

#22 | Thought Leadership | Digitising data centre construction with augmented reality and ultra-precise positioning

0:00 39:41

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of The iMasons Innovation Podcast Thought Leadership?

This episode is 39 minutes long.

When was this The iMasons Innovation Podcast Thought Leadership episode published?

This episode was published on July 31, 2025.

What is this episode about?

Innovation Committee Chair and host Romain Tranchant interviews Waleed Zafar.   Waleed Zafar is the Director of Mission Critical at XYZ Reality, a company transforming how mission-critical projects are planned, built, and delivered with its...

Can I download this The iMasons Innovation Podcast Thought Leadership episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!