2331: Significant resource update at Blencowe's Orom-Cross graphite project episode artwork

EPISODE · Mar 6, 2026 · 10 MIN

2331: Significant resource update at Blencowe's Orom-Cross graphite project

from The Vox Markets Podcast · host Vox Markets Podcast

Watch on YouTube Blencowe has announced the addition of a JORC resource for the Iyan deposit at its Orom-Cross graphite project in Uganda. The total resource at the project now stands at 43 million tonnes of ore, with only 2% of the surface area of the licence drilled. The company will also be releasing further drill results from the Beehive deposits in due course, and these will lead on to a further resource upgrade. Will Orom-Cross go through the magic 50 million tonnes mark? It's a number that chief executive Mike Ralston floats without hesitation as he sits down to walk us through the implications of the latest results, and to tell us what happens next.

NOW PLAYING

2331: Significant resource update at Blencowe's Orom-Cross graphite project

0:00 10:25

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Vox Markets Podcast?

This episode is 10 minutes long.

When was this The Vox Markets Podcast episode published?

This episode was published on March 6, 2026.

What is this episode about?

Watch on YouTube Blencowe has announced the addition of a JORC resource for the Iyan deposit at its Orom-Cross graphite project in Uganda. The total resource at the project now stands at 43 million tonnes of ore, with only 2% of the surface area of...

Can I download this The Vox Markets Podcast episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!