2393: Cadence Minerals now less than two months from production episode artwork

EPISODE · May 6, 2026 · 12 MIN

2393: Cadence Minerals now less than two months from production

from The Vox Markets Podcast · host Vox Markets Podcast

Watch on YouTubeCadence Minerals has received the Installation Licence for its Amapa iron ore project in Brazil. The granting of the licence allows the company to move towards production from the Azteca plant, and this is expected to be up and running at the rate of 380,000 tonnes per year within two months time. Production from Azteca will generate cashflow to enable funding of the development of the wider Amapa project, which is slated to produce 5.5 million tonnes of DR-grade product per year. Cadence's chief executive Kiran Morzaria joins Vox to tell us more

NOW PLAYING

2393: Cadence Minerals now less than two months from production

0:00 12:49

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Vox Markets Podcast?

This episode is 12 minutes long.

When was this The Vox Markets Podcast episode published?

This episode was published on May 6, 2026.

What is this episode about?

Watch on YouTubeCadence Minerals has received the Installation Licence for its Amapa iron ore project in Brazil. The granting of the licence allows the company to move towards production from the Azteca plant, and this is expected to be up and...

Can I download this The Vox Markets Podcast episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!