3 Sheldon Square: Accelerating low carbon retrofit
Episode 74 of the FOOTPRINT+ podcasts podcast, hosted by FOOTPRINT+, titled "3 Sheldon Square: Accelerating low carbon retrofit" was published on November 6, 2024 and runs 44 minutes.
November 6, 2024 ·44m · FOOTPRINT+ podcasts
Summary
3 Sheldon Square sits in British Land & GIC's Paddington Central campus, adjacent to Paddington Station. 3 Sheldon Square was originally constructed c2000, and with all office tenants vacating in 2022, British Land explored a multitude of development and refurbishment options. Retention and reposition of the existing building was the preferred scheme option taken forward, and the project achieves Practical Completion in Q1 2024. This session looks to explore the rationale behind the preferred scheme option, sustainability success and how this fed into attracting a significant anchor letting to compete with new build office product in the vicinity. Luke Kelly, Project Director - British Land Hannah Poole, Senior Leasing Manager - British Land Joe Morris, Founding Director - Morris+Company Mohamad Yassine, Associate Director - Rambol
Episode Description
3 Sheldon Square sits in British Land & GIC's Paddington Central campus, adjacent to Paddington Station. 3 Sheldon Square was originally constructed c2000, and with all office tenants vacating in 2022, British Land explored a multitude of development and refurbishment options.
Retention and reposition of the existing building was the preferred scheme option taken forward, and the project achieves Practical Completion in Q1 2024. This session looks to explore the rationale behind the preferred scheme option, sustainability success and how this fed into attracting a significant anchor letting to compete with new build office product in the vicinity.
Luke Kelly, Project Director - British Land Hannah Poole, Senior Leasing Manager - British Land Joe Morris, Founding Director - Morris+Company Mohamad Yassine, Associate Director - Rambol