EPISODE · Jul 29, 2024 · 3 MIN
Ballinacarrow locals call for junction redevelopment to be scrapped
Locals in Ballincarrow have sought for a redevelopment of a junction to be scrapped.There have been long-running issues in relation to speed travelling through the village, which is where residents see the priority of roads funding should be.With major developments such as a bypass being at least ten years away, safety measures have been called for to curve the amount of motorists speeding in the area.Ballymote-Tubbercurry Cllr Michael Clarke says he was contacted directly to bring a halt to TII’s proposal of narrowing a junction.Fellow Cllr Dara Mulvey says priority needs to be given to traffic calming measures.
NOW PLAYING
Ballinacarrow locals call for junction redevelopment to be scrapped
No transcript for this episode yet
Similar Episodes
Apr 21, 2026 ·13m
Apr 19, 2026 ·16m
Apr 17, 2026 ·13m
Apr 13, 2026 ·11m
Apr 11, 2026 ·16m