EPISODE · Jun 16, 2026 · 1 MIN
Brent Spence Bridge Closures Coming
from Cincinnati News Today | 2 Min News | The Daily News Now!
Drivers in Ohio brace for major changes at the Brent Spence Bridge starting late this month, with permanent ramp closures including the eastbound U.S. 50 to Second Street exit on June 28 and the I-75 South to Second Street exit on June 29—replaced by a new Third Street ramp. Part of a $4 billion overhaul, the project includes a future double-decker bridge, upgraded approaches, and re-striping of the existing span, with construction expected until 2031. Meanwhile, the Linn Street overpass has already been demolished as part of a larger effort to rebuild the bridge with new bike lanes and sidewalks. Stay tuned to the Brent Spence Bridge Corridor website for real-time traffic updates as this massive infrastructure upgrade reshapes the region. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/e9fb7a1f88f89a3d
NOW PLAYING
Brent Spence Bridge Closures Coming
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Mar 19, 2026 ·34m
Feb 18, 2026 ·11m
Feb 11, 2026 ·45m