Bungles, Blowouts and Boondoggles: why Australia’s infrastructure projects cost more than they should | Grahame Campbell

EPISODE · Jan 9, 2024 · 59 MIN

Bungles, Blowouts and Boondoggles: why Australia’s infrastructure projects cost more than they should | Grahame Campbell

from The Centre for Independent Studies Research Collection · host cisresearch

Bungles, Blowouts and Boondoggles: why Australia’s infrastructure projects cost more than they should.  By Grahame Campbell A large amount of taxpayers’ money, state and federal, is expended on large scale infrastructure that is intended to play a crucial part in Australia’s growth and prosperity — although some of it is arguably wasteful or perhaps even pork-barrelling. And as the recent federal government Infrastructure Investment Review found in axing around 50 planned projects, some “do not demonstrate merit, lack any national strategic rationale and do not meet the Australian Government’s national investment priorities. In many cases these projects are also at high risk of further cost pressures and/or delays.” But major infrastructure projects in Australia are often also more expensive than comparable projects in other countries, even after even after adjusting for differences in currencies and purchasing power. While a 2014 Productivity Commission Inquiry report on public infrastructure argued that there were examples where Australia was competitive internationally, and that the systematic evidence was missing or incomplete, it noted that several commentators argued Australia performed worse than other countries. The PC, while arguing for substantial reform to our infrastructure processes, also noted there was “considerable uncertainty about many facets of construction costs. There are sometimes large and inexplicable variations in the construction costs for what appear to be similar activities, such as the cost per kilometre of rail projects.” It is unlikely that much has improved since 2014, especially given the findings of the recent review and estimates that construction costs increased more than 25% over the five years to mid-2022. There are several factors that contribute to the higher costs of major infrastructure in Australia. The available evidence on major infrastructure construction costs shows that there have been some recent significant increases in input costs. This particularly applies to labour and project management costs, plus contract design, complexity and poor management leading to risk offloading, cost over-runs and costly schedule over-runs. However, it is important to note that the cost of projects can also vary based on specific circumstances, project scope, and other factors. As listed below, and explained in more detail in the subsequent sections related to costs, factors that can contribute to higher costs for Australian infrastructure projects include: Labour and Industrial Relations: Australia generally has higher labour costs compared with many other countries. Wages, benefits, and labour regulations can contribute to higher project costs. Lower Productivity: Productivity is hampered by the lack of a sufficiently educated, skilled and engaged workforce, an efficient work environment, innovation, efficient procurement models and ultimately trust between industry stakeholders. Regulations and Standards: Australia has strict regulations and standards when it comes to construction, safety, and environmental considerations. Compliance with these regulations often adds to the complexity and cost of infrastructure projects. Design Complexity: Infrastructure projects in Australia often involve complex engineering and design requirements. This can include considerations such as environmental impact, sustainability, and resilience, which may contribute to increased costs. Project Management: Effective project management is crucial for successful infrastructure projects. Factors like inefficient planning, delays, and changes in scope can contribute to cost overruns. Risk Offloading: Project cost is often inflated in Australia by a misguided focus on unloading risk in the early stages of a project’s development. This is often driven by the type of contract that is presented to the industry by lawyers, with the objective of minimising up-front costs and putting most of the risks on the contractors. This practice is not generally followed in other countries, which look at ‘whole of Life’ costs and benefits, resulting in a more cooperative and cheaper outcome. Read the paper here: https://www.cis.org.au/publication/bungles-blowouts-and-boondoggles-why-australias-infrastructure-projects-cost-more-than-they-should/

NOW PLAYING

Bungles, Blowouts and Boondoggles: why Australia’s infrastructure projects cost more than they should | Grahame Campbell

0:00 59:54

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

MG Show MG Show The MG Show, hosted by Jeffrey Pedersen and Shannon Townsend, is a leading alternative media platform dedicated to uncovering the truth behind today’s most pressing political issues. Launched in 2019, the show has grown exponentially, offering unfiltered insights, comprehensive research, and real-time analysis. With a commitment to independent journalism and factual integrity, the MG Show empowers its audience with knowledge and encourages active participation in the political discourse. The Game Radio Popolare Soldi, lavoro, avidità, disoccupazioni: il grande gioco dell’economia smontato ogni giorno da Raffaele Liguori. Photo Breakdown Scott Wyden Kivowitz Photo Breakdown is a podcast in which we explore the world of photography with a trusted guide, host Scott Wyden Kivowitz. His expertise and passion bring the industry to life as we explore the stories, trends, and ideas shaping it today. Join us as we dissect everything from incredible photographs and creative techniques to the latest gear releases and hot topics in the photography community.In each episode, we break down what’s happening behind the scenes - whether it’s making a powerful image, a candid discussion on industry trends, or a reflection on the tools and technology changing how we make photographs. You’ll get insights, expert opinions, and a fresh perspective on what’s top of mind for photographers right now.Anticipate short, engaging episodes brimming with ideas and inspiration. Be part of the conversation by sharing your thoughts, voice notes, and comments. Your participation is what makes our community vibrant and dynamic.It’s more than just photography - everyth The Last Outlaws Impact Studios at UTS In a History Lab season like no other, we're pulling on the threads of one of Australia's great misunderstood histories, moving beyond the myths to learn what the Aboriginal brothers Jimmy and Joe Governor faced in both life and death.Australia's budding Federation is the background setting to this remarkable story, that sees the Governor brothers tied to the inauguration of a 'new' nation and Australia's dark history of frontier violence, racial injustice and the global trade and defilement of Aboriginal ancestral remains. This Impact Studios production is a collaboration with the Governor family, UTS Faculty of Law and Jumbunna Institute for Indigenous Education and Research.The Last Outlaws teamKatherine Biber - UTS Law Professor and Chief InvestigatorAunty Loretta Parsley - Great-granddaughter of Jimmy Governor and the Governor Family Historian Leroy Parsons - Governor descendant, Narrator and Co-WriterKaitlyn Sawrey - Host, Writer and Senior ProducerFrank Lopez - Writer,
URL copied to clipboard!