EPISODE · Jan 17, 2026 · 4 MIN
Coast Guard approves fixed-span design for new Interstate Bridge
The U.S. Coast Guard has approved the fixed-span design for the proposed new Interstate Bridge over the Columbia River, a decision announced by Sen. Maria Cantwell that advances the Interstate Bridge Replacement Program toward construction, addresses maritime navigation concerns, and removes the need for a lift span that currently disrupts traffic on Interstate 5. https://www.clarkcountytoday.com/news/coast-guard-approves-fixed-span-design-for-new-interstate-bridge/ #InterstateBridge #IBR #Infrastructure #Vancouver #WashingtonPolitics
What this episode covers
The U.S. Coast Guard has approved the fixed-span design for the proposed new Interstate Bridge over the Columbia River, a decision announced by Sen. Maria Cantwell that advances the Interstate Bridge Replacement Program toward construction, addresses maritime navigation concerns, and removes the need for a lift span that currently disrupts traffic on Interstate 5. https://www.clarkcountytoday.com/news/coast-guard-approves-fixed-span-design-for-new-interstate-bridge/ #InterstateBridge #IBR #Infrastructure #Vancouver #WashingtonPolitics
NOW PLAYING
Coast Guard approves fixed-span design for new Interstate Bridge
No transcript for this episode yet
Similar Episodes
Apr 21, 2026 ·13m
Apr 19, 2026 ·16m
Apr 17, 2026 ·13m
Apr 13, 2026 ·11m
Apr 11, 2026 ·16m