EPISODE · Jun 24, 2026 · 1 MIN
Columbia Substation Builds Guyana’s Power Future
from Guyana News Today | 2 Min News | The Daily News Now!
Guyana Power and Light is powering ahead with the big new Columbia Substation, kicking off construction on June 20, 2026, with loud pile-driving to lay a solid foundation. This major upgrade aims to boost voltage, handle rising demand, and keep the lights on reliably—especially in the growing Demerara-Berbice region. Built with Kalpataru Projects International Limited, the project prioritizes quality, safety, and minimal disruption to nearby communities. After the foundation, crews will assemble the structure, install equipment, and connect it to the grid—part of a broader push to modernize Guyana’s entire power system for future economic growth. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/83ba5a0e883aa886
NOW PLAYING
Columbia Substation Builds Guyana’s Power Future
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Mar 19, 2026 ·34m
Feb 18, 2026 ·11m
Feb 11, 2026 ·45m