DOJ Drops Powell Probe, IG Takes Over Fed Cost Overruns episode artwork

EPISODE · Apr 24, 2026 · 1 MIN

DOJ Drops Powell Probe, IG Takes Over Fed Cost Overruns

from The Daily News Now! Business

Federal Reserve Chair Jerome Powells criminal investigation is closed, paving the way for President Trumps pick, Kevin Warsh, to take over. However, the Federal Reserves Inspector General is now probing massive building cost overruns, which could still impact Warshs confirmation. The IGs report is expected soon, but the probe could reopen if new facts emerge. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/2a1f6fe70bfc2ecd

NOW PLAYING

DOJ Drops Powell Probe, IG Takes Over Fed Cost Overruns

0:00 1:04

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of The Daily News Now! Business?

This episode is 1 minute long.

When was this The Daily News Now! Business episode published?

This episode was published on April 24, 2026.

What is this episode about?

Federal Reserve Chair Jerome Powells criminal investigation is closed, paving the way for President Trumps pick, Kevin Warsh, to take over. However, the Federal Reserves Inspector General is now probing massive building cost overruns, which...

Can I download this The Daily News Now! Business episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!