EPISODE · Jul 16, 2024 · 2 MIN
ep.077|怎么用“behind schedule”来表达赶不上进度啦
*** behind schedule ***描述某个项目、任务或计划进度落后,未能按时完成词组分解behind - 在背后,留在远处;在...的后面,作为...的原因;支持,落后。既可作副词,也可作介词schedule - 时刻表,计划,日程安排;安排。既可作名词,也可作动词例句Unfortunately, we are behind schedule due to some unexpected technical issues.不幸的是,由于一些意外的技术问题,我们的进度落后了。The development is behind schedule, but we are working overtime to catch up.开发进度落后了,但我们正在加班赶上进度。
NOW PLAYING
ep.077|怎么用“behind schedule”来表达赶不上进度啦
0:00
2:28
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of BizLingo|实用英文|早8人的口语小福袋?
This episode is 2 minutes long.
When was this BizLingo|实用英文|早8人的口语小福袋 episode published?
This episode was published on July 16, 2024.
What is this episode about?
*** behind schedule ***描述某个项目、任务或计划进度落后,未能按时完成词组分解behind - 在背后,留在远处;在...的后面,作为...的原因;支持,落后。既可作副词,也可作介词schedule - 时刻表,计划,日程安排;安排。既可作名词,也可作动词例句Unfortunately, we are behind schedule due to some unexpected technical issues.不幸的是,由于一些意外的技术问题,我们的进度落后了。The...
Can I download this BizLingo|实用英文|早8人的口语小福袋 episode?
Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!