EPISODE · Jul 4, 2026 · 1 MIN
Essequibo Wharf Upgrade Progress | Guyana News
from Guyana News Today | 2 Min News | The Daily News Now!
The $88 million Charity Market Multipurpose Wharf near the Pomeroon River is 30% complete, with the main concrete structure finished and crews now pouring the deck’s top layer. Fifty-three massive concrete piles are already in place for boat berths, and a private wharf is being demolished to make way for the new 140-foot-wide facility, complete with a floating bridge for larger ships. A 300-meter riverbank wall is also under construction in two sections, all designed to boost trade and logistics in the Essequibo region. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/64b573fc0471b57e
NOW PLAYING
Essequibo Wharf Upgrade Progress | Guyana News
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Mar 19, 2026 ·34m
Feb 18, 2026 ·11m
Feb 11, 2026 ·45m