EPISODE · Jul 2, 2025 · 17 MIN
Giant Transformers and Huge 2.8-year Lead Times! With Sachin Gupta of Pennsylvania Transformer Technology
from Sean White‘s Solar and Energy Storage Podcast · host whitehousesolar
In this episode of Sean White's Solar and Energy Storage Podcast, Sean interviews Sachin Gupta at the American Clean Power conference in Arizona. They discuss the lengthy lead times for huge transformers, the challenges of supply chains, and the capabilities of Pennsylvania Transformer Technology. Gupta explains the details of manufacturing and delivering massive transformers, some of which take up to three years to produce. They cover the significance of Made in America products, the impact of tariffs, and the growing demands in the solar and energy storage sectors. Additionally, they talk about the future of transformer technology, including potential developments in high voltage direct current (HVDC) applications. Topics discussed: American Clean Power (ACP) Affordable Wire Management 144 to 146 weeks lead time Supply chain 50 to 500 MVa transformer MVA (VA=volts x amps) Tariffs 765,000 volts transformer Single Phase Transformer Bushing American Wind Energy Association (AWEA) Utility Scale Rooftop solar Small pad transformers Collector transformer = Large power transformer Pad mounted transformer Civil pad FAT = Factory Acceptance Test Minimum 25 years life span up to 40 to 50 years HVDC = High Voltage Direct Current Reach out to Sachin Gupta here: LinkedIn: www.linkedin.com/in/sachin-gupta-b1997b1a Pennsylvania Transformer Technology LLC: www.patransformer.com Learn more at www.solarSEAN.com and be sure to get NABCEP certified by taking Sean’s classes at www.heatspring.com/sean
What this episode covers
In this episode of Sean White's Solar and Energy Storage Podcast, Sean interviews Sachin Gupta at the American Clean Power conference in Arizona. They discuss the lengthy lead times for huge transformers, the challenges of supply chains, and the capabilities of Pennsylvania Transformer Technology. Gupta explains the details of manufacturing and delivering massive transformers, some of which take up to three years to produce. They cover the significance of Made in America products, the impact of tariffs, and the growing demands in the solar and energy storage sectors. Additionally, they talk about the future of transformer technology, including potential developments in high voltage direct current (HVDC) applications. Topics discussed: American Clean Power (ACP) Affordable Wire Management 144 to 146 weeks lead time Supply chain 50 to 500 MVa transformer MVA (VA=volts x amps) Tariffs 765,000 volts transformer Single Phase Transformer Bushing American Wind Energy Association (AWEA) Utility Scale Rooftop solar Small pad transformers Collector transformer = Large power transformer Pad mounted transformer Civil pad FAT = Factory Acceptance Test Minimum 25 years life span up to 40 to 50 years HVDC = High Voltage Direct Current Reach out to Sachin Gupta here: LinkedIn: www.linkedin.com/in/sachin-gupta-b1997b1a Pennsylvania Transformer Technology LLC: www.patransformer.com Learn more at www.solarSEAN.com and be sure to get NABCEP certified by taking Sean’s classes at www.heatspring.com/sean
NOW PLAYING
Giant Transformers and Huge 2.8-year Lead Times! With Sachin Gupta of Pennsylvania Transformer Technology
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.