EPISODE · Jun 26, 2026 · 1 MIN
Half Million Euro Design Waste?
from Galway News Today | 2 Min News | The Daily News Now!
Atlantic Technological University in Galway dumped over 200K euros on architects for a student building — only to freeze the project in 2022 when costs ballooned from 14M to 18M euros. Nearly half a million euros in design fees, including 113K to one firm and 145K on engineering, went to waste — critics calling it reckless spending on a project that never broke ground. But the university insists the work retains value, with new planning permission in hand and the original site still preferred — keeping the door open for future construction if costs stabilize. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/e44c53d98091cfef
NOW PLAYING
Half Million Euro Design Waste?
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Mar 19, 2026 ·34m
Feb 18, 2026 ·11m
Feb 11, 2026 ·45m