EPISODE · May 25, 2026 · 1 MIN
I-40 Rebuilt for Future Storms
from Winston–Salem News Today | 2 Min News | The Daily News Now!
A $2 billion rebuild of Interstate 40 in the Pigeon River Gorge is underway after Hurricane Helene caused catastrophic damage, with engineers deploying cutting-edge roller-compacted concrete to construct towering, flood-resistant retaining walls. A temporary causeway and local rock sourcing from Pisgah National Forest cut costs and boosted efficiency, while crews battle rattlesnakes and rugged terrain. Though traffic remains one lane each way, full restoration is targeted for fall 2028, turning a disaster zone into a resilient highway backbone. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/a0b45b4b3e161a47
NOW PLAYING
I-40 Rebuilt for Future Storms
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Mar 19, 2026 ·34m
Feb 18, 2026 ·11m
Feb 11, 2026 ·45m