I-494 Closures & Future E-ZPass Plans episode artwork

EPISODE · Jun 25, 2026 · 1 MIN

I-494 Closures & Future E-ZPass Plans

from Minneapolis News Today | 2 Min News | The Daily News Now!

Drivers on I-494 between I-35W and Highway 77 brace for major overnight closures starting June 29, with lane shutdowns through early July to install a new bridge deck. MnDOT’s phased plan aims to reduce congestion, boost safety, and eventually add E-ZPass lanes by 2030—with new ramps at the I-35W interchange expected by 2026. Expect detours, slower speeds, and weather delays; patience is key as this construction reshapes the corridor for the long haul. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/4c4b790353f9ea2f

NOW PLAYING

I-494 Closures & Future E-ZPass Plans

0:00 1:50

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Minneapolis News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Minneapolis News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on June 25, 2026.

What is this episode about?

Drivers on I-494 between I-35W and Highway 77 brace for major overnight closures starting June 29, with lane shutdowns through early July to install a new bridge deck. MnDOT’s phased plan aims to reduce congestion, boost safety, and eventually...

Can I download this Minneapolis News Today | 2 Min News | The Daily News Now! episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!