EPISODE · Jun 12, 2026 · 1 MIN
Massive Bridge Slide Coming July
from Pittsburgh News Today | 2 Min News | The Daily News Now!
PennDOT is set to slide in a brand-new, 22-million-pound Parkway East bridge using Accelerated Bridge Construction—meaning less disruption, faster rebuild. The old bridge will come down after the new deck is finished, and the entire Parkway East will shut down both directions for 25 days starting July 10th at 9 p.m. Commercial Street will also face closures, with a test slide in late June and major work stretching into early August, followed by another reconfiguration in the fall—all to keep traffic flowing once the massive new bridge is in place. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/158fe39660966e54
NOW PLAYING
Massive Bridge Slide Coming July
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Mar 19, 2026 ·34m
Feb 18, 2026 ·11m
Feb 11, 2026 ·45m