Montenegro’s Chinese road episode artwork

EPISODE · Jan 13, 2022 · 27 MIN

Montenegro’s Chinese road

from The Documentary Podcast · host BBC World Service

It’s been called the priciest piece of tarmac in the world. In 2014 the government of Montenegro signed a contract with a state-owned Chinese company to build part of a 170 kilometre-long highway – a road that would connect its main port with the Serbian border to the north. The price-tag on the first 42 kilometres of asphalt was a staggering $1 billion - most of which has been borrowed from a Chinese bank. In Montenegro, questions continue to be asked about why the project went ahead when some experts said that it was not viable. The River Tara – a UNESCO protected site – has been impacted by the building works, and allegations of corruption and kickbacks have hung around like a bad smell. Meanwhile, the economy has taken a massive hit as a result of the pandemic, and some Montenegrins worry about the country's ability to repay the loan. Worse still, a clause in the road contract states that Montenegro may relinquish sovereignty over unspecified parts of its territory if there is a default. But is everything as it seems? Assignment investigates. Presenter: Linda Pressly Producer: Mike Gallagher Editor: Bridget Harney(Image: A slogan for Chinese construction workers adorns part of Montenegro’s new mountain road. Credit: BBC/Michael Gallagher)

It’s been called the priciest piece of tarmac in the world. In 2014 the government of Montenegro signed a contract with a state-owned Chinese company to build part of a 170 kilometre-long highway – a road that would connect its main port with the Serbian border to the north. The price-tag on the first 42 kilometres of asphalt was a staggering $1 billion - most of which has been borrowed from a Chinese bank. In Montenegro, questions continue to be asked about why the project went ahead when some experts said that it was not viable. The River Tara – a UNESCO protected site – has been impacted by the building works, and allegations of corruption and kickbacks have hung around like a bad smell. Meanwhile, the economy has taken a massive hit as a result of the pandemic, and some Montenegrins worry about the country's ability to repay the loan. Worse still, a clause in the road contract states that Montenegro may relinquish sovereignty over unspecified parts of its territory if there is a default. But is everything as it seems? Assignment investigates. Presenter: Linda Pressly Producer: Mike Gallagher Editor: Bridget Harney(Image: A slogan for Chinese construction workers adorns part of Montenegro’s new mountain road. Credit: BBC/Michael Gallagher)

NOW PLAYING

Montenegro’s Chinese road

0:00 27:32

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of The Documentary Podcast?

This episode is 27 minutes long.

When was this The Documentary Podcast episode published?

This episode was published on January 13, 2022.

What is this episode about?

It’s been called the priciest piece of tarmac in the world. In 2014 the government of Montenegro signed a contract with a state-owned Chinese company to build part of a 170 kilometre-long highway – a road that would connect its main port with the...

Can I download this The Documentary Podcast episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!