EPISODE · Jun 25, 2026 · 1 MIN
Moving a 22-Million-Pound Bridge
from Pittsburgh News Today | 2 Min News | The Daily News Now!
PennDOT is preparing to move a 22-million-pound bridge — the Commercial Street bridge over Parkway East — in a high-stakes test run today, using 42 hydraulic jacks and specialized crews to lift, slide, and reposition it with millimeter precision. The test, which involves moving the bridge just a few feet while monitoring every shift, is critical for next month’s full relocation. Commercial Street and the Nine Mile Run trail are closed for prep, with a tentative reopening at 4 PM if all goes well — but expect more closures through early August as construction continues, all while Parkway East traffic remains unaffected. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/d5d4c5cbab4a325b
NOW PLAYING
Moving a 22-Million-Pound Bridge
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Mar 19, 2026 ·34m
Feb 18, 2026 ·11m
Feb 11, 2026 ·45m