Opening of Canada-US bridge that Trump threatened to block is delayed over unresolved 'issues' episode artwork

EPISODE · Jun 12, 2026 · 0 MIN

Opening of Canada-US bridge that Trump threatened to block is delayed over unresolved 'issues'

from Latest Stories from The Associated Press · host The Associated Press

The ribbon cutting for a Michigan bridge meant to ease traffic and symbolize international cooperation has been postponed. The AP's Jennifer King reports.

NOW PLAYING

Opening of Canada-US bridge that Trump threatened to block is delayed over unresolved 'issues'

0:00 0:57

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of Latest Stories from The Associated Press?

This episode is 0 minutes long.

When was this Latest Stories from The Associated Press episode published?

This episode was published on June 12, 2026.

What is this episode about?

The ribbon cutting for a Michigan bridge meant to ease traffic and symbolize international cooperation has been postponed. The AP's Jennifer King reports.

Can I download this Latest Stories from The Associated Press episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!