Tony Keddy: Number Eight Studios project leader on the film studio receiving consents to build in Hawke's Bay episode artwork

EPISODE · Feb 20, 2024 · 2 MIN

Tony Keddy: Number Eight Studios project leader on the film studio receiving consents to build in Hawke's Bay

from Early Edition with Ryan Bridge · host Newstalk ZB

It seems the path has been cleared for a multi-million-dollar film studio in Hawke's Bay.  Number Eight Studios has received resource consent from Hastings District Council for its 400-hectare facility in the coastal township of Te Awanga.  Despite having been five years since the first proposal, project leader Tony Keddy says it's been worth the wait.  The idea is for buildings to be built for the specific needs of the film industry, bringing a raft of international productions to Hawke's Bay home.  LISTEN ABOVE See omnystudio.com/listener for privacy information.

NOW PLAYING

Tony Keddy: Number Eight Studios project leader on the film studio receiving consents to build in Hawke's Bay

0:00 2:38

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Early Edition with Ryan Bridge?

This episode is 2 minutes long.

When was this Early Edition with Ryan Bridge episode published?

This episode was published on February 20, 2024.

What is this episode about?

It seems the path has been cleared for a multi-million-dollar film studio in Hawke's Bay.  Number Eight Studios has received resource consent from Hastings District Council for its 400-hectare facility in the coastal township of Te Awanga.  Despite...

Can I download this Early Edition with Ryan Bridge episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!