EPISODE · Nov 7, 2023 · 3 MIN
Trenchless Tuesday | November 7, 2023 | Episode 29
from Pipe Reline Solutions · host Recycled Media
This week Cassie Clancy is live on site in Priest River, Idaho for a Snap-Tite install. Watch as she takes you through the process of relining a failing 48 in'' corrugated metal pipe that is severely damaged and almost completely deteriorated at the entrances. This sliplining project called for 6 sticks of 42in" snap-tite.
What this episode covers
This week Cassie Clancy is live on site in Priest River, Idaho for a Snap-Tite install. Watch as she takes you through the process of relining a failing 48 in'' corrugated metal pipe that is severely damaged and almost completely deteriorated at the entrances. This sliplining project called for 6 sticks of 42in" snap-tite.
NOW PLAYING
Trenchless Tuesday | November 7, 2023 | Episode 29
No transcript for this episode yet
Similar Episodes
Apr 22, 2025 ·32m
Feb 27, 2025 ·0m
Sep 20, 2024 ·57m
Aug 7, 2024 ·16m