EPISODE · Jun 10, 2026 · 1 MIN
Washington Bridge Builds Ahead of Schedule
from Providence News Today | 2 Min News | The Daily News Now!
The Washington Bridge is officially underway—steel beams are being lowered into the water ahead of schedule as crews build a century-long, upgrade-ready structure with five lanes, widened I-95 West, and new exits for Gano Street and Waterfront Drive, all aimed at crushing traffic chaos and wrapping up by 2028. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/144ca615755109c6
NOW PLAYING
Washington Bridge Builds Ahead of Schedule
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Mar 19, 2026 ·34m
Feb 18, 2026 ·11m
Feb 11, 2026 ·45m