What A Red Line Extension Could Mean For Chicago’s Far South Side episode artwork

EPISODE · Sep 12, 2023 · 23 MIN

What A Red Line Extension Could Mean For Chicago’s Far South Side

from In the Loop with Sasha-Ann Simons

The $3.7-billion project — 50 years in the making — has reached what transit officials call “the final phase” of the federal funding process. When complete, the Red Line will include four new stops, including a new terminus at 130th Street near Altgeld Gardens. Reset checks in with community leaders from the far South Side: Cheryl Johnson with People for Community Recovery, Rev. Otis Moss III from Trinity United Church of Christ, and Andrea Reed with Greater Roseland Chamber of Commerce. And they sound off about the potential positive impacts of connecting their neighborhoods to the El system.

NOW PLAYING

What A Red Line Extension Could Mean For Chicago’s Far South Side

0:00 23:39

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of In the Loop with Sasha-Ann Simons?

This episode is 23 minutes long.

When was this In the Loop with Sasha-Ann Simons episode published?

This episode was published on September 12, 2023.

What is this episode about?

The $3.7-billion project — 50 years in the making — has reached what transit officials call “the final phase” of the federal funding process. When complete, the Red Line will include four new stops, including a new terminus at 130th Street near...

Can I download this In the Loop with Sasha-Ann Simons episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!