Willard Munger Trail Reopens with New Bridge | Duluth News episode artwork

EPISODE · Jul 1, 2026 · 1 MIN

Willard Munger Trail Reopens with New Bridge | Duluth News

from Duluth News Today | 2 Min News | The Daily News Now!

The Willard Munger State Trail is officially back open, thanks to major upgrades including a brand-new 100-foot steel truss bridge replacing a cramped culvert that blocked fish migration. This $1.5 million restoration, funded by the Outdoor Heritage Fund and local mitigation dollars, reconnects the trail near Pulaski Street and Riverwest Drive — now flowing freely for both recreation and wildlife. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/5f1a3bae527c6455

NOW PLAYING

Willard Munger Trail Reopens with New Bridge | Duluth News

0:00 1:17

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Duluth News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Duluth News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on July 1, 2026.

What is this episode about?

The Willard Munger State Trail is officially back open, thanks to major upgrades including a brand-new 100-foot steel truss bridge replacing a cramped culvert that blocked fish migration. This $1.5 million restoration, funded by the Outdoor...

Can I download this Duluth News Today | 2 Min News | The Daily News Now! episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!