28 Day Cure
Join our resident experts to discuss, green concrete, why wait 28 days before coating concrete, and the basics of how to test concrete for moisture.
Episode 9 of the Coatings Decoded podcast, hosted by Tnemec Company, Inc., titled "28 Day Cure" was published on December 14, 2021 and runs 16 minutes.
December 14, 2021 ·16m · Coatings Decoded
Episode Description
Similar Episodes
Feb 28, 2026 ·56m
Feb 25, 2026 ·39m
Dec 12, 2025 ·12m
Sep 23, 2025 ·28m