Subsea Cable Failures
In this episode, host Jamie Bernthal-Hooker is joined by offshore wind transmission and cable experts Rameeza Haq Duggal and Vincenzo Poidomani to discuss the increasing risks and costs of offshore cable failures. They discuss the recent failure of the Estlink 2 subsea cable between Finland and Estonia, the suspected involvement of a shadow fleet and the costly repairs now underway. The conversation also dives into broader industry risks and its estimated costs. With offshore wind and interconnector projects expanding rapidly, what does the future hold for cable reliability? Tune in for expert insights on one of the sector's most pressing challenges.
Episode 2 of the PowerPod podcast, hosted by Rameeza Haq Duggal, Vincenzo Poidomani, Jamie Bernthal-Hooker, titled "Subsea Cable Failures" was published on April 2, 2025 and runs 24 minutes.
April 2, 2025 ·24m · PowerPod
Summary
In this episode, host Jamie Bernthal-Hooker is joined by offshore wind transmission and cable experts Rameeza Haq Duggal and Vincenzo Poidomani to discuss the increasing risks and costs of offshore cable failures. They discuss the recent failure of the Estlink 2 subsea cable between Finland and Estonia, the suspected involvement of a shadow fleet and the costly repairs now underway. The conversation also dives into broader industry risks and its estimated costs. With offshore wind and interconnector projects expanding rapidly, what does the future hold for cable reliability? Tune in for expert insights on one of the sector's most pressing challenges.
Episode Description
Similar Episodes
Nov 8, 2019 ·4m
Oct 23, 2019 ·3m
Sep 30, 2019 ·3m
Sep 7, 2019 ·3m
Mar 23, 2019 ·2m
Feb 15, 2019 ·2m