EPISODE · Jun 15, 2019 · 1H 48M
Peter Catchpole | 10
from Powerline Podcast · host Ryan Lucas
This episode is about two circuits of 287kV transmission line that run from Kemano, BC up through the Kildala mountain pass and down to Kitimat. The world's first two catenary structures are what make this line unique, and this is a story about their design and construction. ✌️SUPPORT THE PODCAST HERE ✌️ 📱FOLLOW THE PODCAST ON SOCIAL MEDIA📱 Instagram: @powerlinepodcast TikTok: @powerlinepodcast YouTube: @powerlinepodcast LinkedIn: Powerline Podcast Facebook: @Powerline-Podcast X: @PowerlinePodcst 🎙️HOST: RYAN LUCAS🎙️ Instagram: @ryanwlucas TikTok: @ryanwlucas LinkedIn: Ryan Lucas 💥INQUIRIES OR GUEST SUGGESTION💥 Email: [email protected]
Embed this episode
Ready to play
Peter Catchpole | 10
No transcript for this episode yet
Similar Episodes
No similar episodes found.