Peter Catchpole | 10 episode artwork

EPISODE · Jun 15, 2019 · 1H 48M

Peter Catchpole | 10

from Powerline Podcast · host Ryan Lucas

This episode is about two circuits of 287kV transmission line that run from Kemano, BC up through the Kildala mountain pass and down to Kitimat. The world's first two catenary structures are what make this line unique, and this is a story about their design and construction.✌️SUPPORT THE PODCAST HERE ✌️📱FOLLOW THE PODCAST ON SOCIAL MEDIA📱Instagram: ⁠⁠⁠⁠⁠⁠⁠⁠⁠@powerlinepodcast⁠⁠⁠⁠⁠⁠⁠⁠TikTok: ⁠⁠⁠⁠⁠⁠⁠⁠@powerlinepodcast⁠⁠⁠⁠⁠⁠⁠⁠YouTube: ⁠⁠⁠⁠⁠⁠⁠⁠@powerlinepodcast⁠⁠⁠⁠⁠⁠⁠⁠LinkedIn: ⁠⁠⁠⁠⁠⁠⁠⁠⁠Powerline Podcast⁠⁠⁠⁠⁠⁠⁠⁠⁠Facebook: ⁠⁠⁠⁠⁠⁠⁠⁠@Powerline-Podcast⁠⁠⁠⁠⁠⁠⁠⁠X: ⁠⁠⁠⁠⁠⁠⁠⁠@PowerlinePodcst⁠⁠⁠⁠⁠⁠⁠⁠🎙️HOST: RYAN LUCAS🎙️Instagram: ⁠⁠⁠⁠⁠⁠⁠⁠@ryanwlucas⁠⁠⁠⁠⁠⁠⁠⁠ TikTok: ⁠⁠⁠⁠⁠⁠⁠⁠@ryanwlucas⁠⁠⁠⁠⁠⁠⁠⁠LinkedIn: ⁠⁠⁠⁠⁠⁠⁠⁠Ryan Lucas⁠⁠⁠⁠⁠⁠⁠⁠💥INQUIRIES OR GUEST SUGGESTION💥Email: ⁠⁠⁠⁠⁠⁠⁠[email protected]

Episode metadata supplied by the publisher feed · Published Jun 15, 2019

Embed this episode

NOW PLAYING

Peter Catchpole | 10

0:00 1:48:46

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Powerline Podcast?

This episode is 1 hour and 48 minutes long.

When was this Powerline Podcast episode published?

This episode was published on June 15, 2019.

Can I download this Powerline Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!