03/12/25 SCCRTC ZEPRT Informational Presentation #4 - P2 - Bridge Types, Estimated Costs and Next Steps episode artwork

EPISODE · Mar 15, 2025 · 26 MIN

03/12/25 SCCRTC ZEPRT Informational Presentation #4 - P2 - Bridge Types, Estimated Costs and Next Steps

from Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

Part 2 is an intro to rail bridges and bridge engineering. There was no discussion of the details of the bridges in this project, and it only covered the range of bridge types that might be used.The cost estimate and next steps are included at the end of this section. There is an episode devoted just to the latter two if you aren't interested in bridge engineering.The project website is here:https://www.sccrtc.org/projects/rail/zeprt/There is a version of the video there.The RTC's Youtube channel with the video is here:https://www.youtube.com/watch?v=vCJdqxnU0jA

Episode metadata supplied by the publisher feed · Published Mar 15, 2025

Embed this episode

NOW PLAYING

03/12/25 SCCRTC ZEPRT Informational Presentation #4 - P2 - Bridge Types, Estimated Costs and Next Steps

0:00 26:28

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks?

This episode is 26 minutes long.

When was this Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episode published?

This episode was published on March 15, 2025.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!