05/01/25 SCCRTC P9 - Hwy 1 Cost Overruns Q&A episode artwork

EPISODE · Jun 2, 2025 · 9 MIN

05/01/25 SCCRTC P9 - Hwy 1 Cost Overruns Q&A

from Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

Hwy 1 Cost Overruns Q&AThe full agenda and highlights are here:https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/The video from Community TV is here:https://youtu.be/kiX6Xh3YzOM?si=cSrP93xlVl6EexW-

Episode metadata supplied by the publisher feed · Published Jun 2, 2025

Embed this episode

NOW PLAYING

05/01/25 SCCRTC P9 - Hwy 1 Cost Overruns Q&A

0:00 9:02

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks?

This episode is 9 minutes long.

When was this Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episode published?

This episode was published on June 2, 2025.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!