1/200 S2E180 - 70 Million Litres of Untreated Wastewater episode artwork

EPISODE · Feb 8, 2026 · 1H 12M

1/200 S2E180 - 70 Million Litres of Untreated Wastewater

from 1/200 · host Kyle Church

The government coalition have heavily signaled their 2026 campaign approaches but this has gone mostly missed by the media. NZ infrastructure is on its last legs and there’s no overt push to bring that into a national conversation.This episode’s co-hostsPhilip, Kyle, SimoneTimestamps0:00 Opening / Introductions2:03 Big Three Missed Reports3:28 Luxon at Waitangi11:39 Winston Peters Testing Facism22:57 David Seymour Colonialism Good, Actually39:09 Wastewater Treatment Plant44:12 Frequency of Disasters58:34 Blocked Fast Track1:09:10 ClosingIntro/Outro by The Prophet MotiveSupport us here: https://www.patreon.com/1of200

Episode metadata supplied by the publisher feed · Published Feb 8, 2026

Embed this episode

NOW PLAYING

1/200 S2E180 - 70 Million Litres of Untreated Wastewater

0:00 1:12:02

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of 1/200?

This episode is 1 hour and 12 minutes long.

When was this 1/200 episode published?

This episode was published on February 8, 2026.

Can I download this 1/200 episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!