10/03/24 SCCRTC - Coastal Rail Trail Segments 8 -11 Project Construction Cost Reduction Strategies - Value Engineering Full Summary episode artwork

EPISODE · Sep 29, 2024 · 11 MIN

10/03/24 SCCRTC - Coastal Rail Trail Segments 8 -11 Project Construction Cost Reduction Strategies - Value Engineering Full Summary

from Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

This is a short summary of Value Engineering Report.I had to convert some tables of alternatives, costs and strategies to text, which worked out OK. The bot mangled a few things on the text to voice conversion but nothing too critical.The full agenda is here:https://www.sccrtc.org/wp-content/uploads/2024/09/2024-10-03-RTC-agenda-packet.pdf

Episode metadata supplied by the publisher feed · Published Sep 29, 2024

Embed this episode

NOW PLAYING

10/03/24 SCCRTC - Coastal Rail Trail Segments 8 -11 Project Construction Cost Reduction Strategies - Value Engineering Full Summary

0:00 11:19

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks?

This episode is 11 minutes long.

When was this Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episode published?

This episode was published on September 29, 2024.

Can I download this Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!