10/4/2022 - Pearl Rover Flood Control | Toxic Waterways | 988 Update episode artwork

EPISODE · Oct 5, 2022 · 14 MIN

10/4/2022 - Pearl Rover Flood Control | Toxic Waterways | 988 Update

from Mississippi Edition

The Pearl River Valley District is set to get an infusion of funding for a flood control project.Then, a recent report rates the toxicity of Mississippi's waterways.Plus, a mental health advocate examines the impact of the 988 crisis line.**This episode is condensed due to MPB Think Radio's fall fund-raising drive. Consider contributing to local journalism by visiting MPB Foundation** Hosted on Acast. See acast.com/privacy for more information.

Episode metadata supplied by the publisher feed · Published Oct 5, 2022

Embed this episode

NOW PLAYING

10/4/2022 - Pearl Rover Flood Control | Toxic Waterways | 988 Update

0:00 14:05

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Mississippi Edition?

This episode is 14 minutes long.

When was this Mississippi Edition episode published?

This episode was published on October 5, 2022.

Can I download this Mississippi Edition episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!