EPISODE · Nov 1, 2022 · 7 MIN
10 Minutes with a Metallurgist: Analyzing Steel with Long Lead Time (ft. Ryan Carr)
from Steel for Success · host Eve
Embed this episode
Ready to play
10 Minutes with a Metallurgist: Analyzing Steel with Long Lead Time (ft. Ryan Carr)
0:00
7:12
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Steel for Success?
This episode is 7 minutes long.
When was this Steel for Success episode published?
This episode was published on November 1, 2022.
Can I download this Steel for Success episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!