Skip to content
106: Migration to Prefabricated Cleanrooms episode artwork

Apr 15, 2021 11 min

106: Migration to Prefabricated Cleanrooms

from The PODTalk PODcast Hosted by G-CON Manufacturing, Inc.

In the biopharmaceutical industry, there has been a shift away from on-site construction to prefabricated solutions. Peter Makowenskyj, Director of Sales Engineering at G-CON Manufacturing Inc., recently told Pharmaceutical Technology that speed to market and lower total cost of ownership for facilities has accelerated this movement in the biopharma sector. He also discussed the strain that the COVID-19 pandemic has placed on operations across the industry and how the situation is creating a need for additional capacity.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

106: Migration to Prefabricated Cleanrooms

0:00 11:38

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The PODTalk PODcast?

This episode is 11 minutes long.

When was this The PODTalk PODcast episode published?

This episode was published on April 15, 2021.

Can I download this The PODTalk PODcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.