EPISODE · May 13, 2021 · 26 MIN
#107 Africa: Connecting a Continent
from Engineering Matters
Preparation is currently underway for installation of one of the world’s longest fibre optic communications cables. Survey vessels are circumnavigating the entire coast of Africa determining the best locations for laying the cable on the seabed and bringing it onshore. At around 36,000km long it will provide connectivity to countries throughout the continent and form...
Embed this episode
Ready to play
#107 Africa: Connecting a Continent
0:00
26:27
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Engineering Matters?
This episode is 26 minutes long.
When was this Engineering Matters episode published?
This episode was published on May 13, 2021.
Can I download this Engineering Matters episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!