Skip to content
#109 How the days run down episode artwork

EPISODE · Sep 14, 2008 · 14 MIN

#109 How the days run down

from Video StudentGuy

A really long, typical, frantic day Arrive early at school to pick up equipment and I trigger the alarm Once back at work I quickly set up for the shoot at 1:00, so the shoot in short order, quickly tear it down and capture it before I run off to school to return the equipment I'm trying to squeeze in a little editing and hand off copies of a rough cut and end up wasting most of my time. Really, the day is an example of how lack of time leads you into making stupid mistakes that waste more time. After wrapping up the day I include a few comments about coping with the stress and allowing the film to work itself out in the moments between getting things done.

Episode metadata supplied by the publisher feed · Published Sep 14, 2008

Embed this episode

Ready to play

#109 How the days run down

0:00 14:28

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Video StudentGuy?

This episode is 14 minutes long.

When was this Video StudentGuy episode published?

This episode was published on September 14, 2008.

Can I download this Video StudentGuy episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!