11 - Reviewing Real Projects for Faster and Cheaper Solutions episode artwork

EPISODE · Jul 12, 2024 · 32 MIN

11 - Reviewing Real Projects for Faster and Cheaper Solutions

from Infrastructure Repair LIVE · host QuakeWrap

Prof. Mo Ehsani covers various construction and repair projects using FRP products and improved systems like SPiRe+. Here's what was covered: (1:06) Project Case Study: Interstate 10 Bridge Strengthening (6:08) Project Case Study: Scottsdale Mall Double T's Strengthening (7:19) Project Case Study: Interstate 10 Box Culverts Rehabilitation (13:47) Project Case Study: Chemical Facility Column Repair (17:56) Project Case Study: Bridge Pier Wall Repair (21:59) Q&A Session

Episode metadata supplied by the publisher feed · Published Jul 12, 2024

Embed this episode

NOW PLAYING

11 - Reviewing Real Projects for Faster and Cheaper Solutions

0:00 32:00

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Infrastructure Repair LIVE?

This episode is 32 minutes long.

When was this Infrastructure Repair LIVE episode published?

This episode was published on July 12, 2024.

Can I download this Infrastructure Repair LIVE episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!