#112 Hagerbach: The Bat Cave of Tunnelling episode artwork

EPISODE · Jun 17, 2021 · 31 MIN

#112 Hagerbach: The Bat Cave of Tunnelling

from Engineering Matters

Every good superhero universe has its origins story. Hagerbach’s begins with Rudolf Amberg, looking to innovate and find new efficiency savings for his iron mine. So began a 50-year journey from testing equipment and explosives, to fire and tunnel safety simulations, and ever more creative uses for underground space. Ultimately the mining industry in Switzerland failed, but Hagerbach survived, and is still an iconic test site for the mining and tunnelling industries. This year it will celebrate its history and look towards its future with the NXT 50 Festival. And some of the ideas on display will push the use of underground space to greater heights than ever before. Guests Antonia Cornaro, Business Development Manager, Amberg Engineering Felix Amberg, President, Amberg Group Michael Kompatscher, CEO, Hagerbach Test Gallery Resources For more information on the Hagerbach NXT 50 Festival, click here For a previous episode of The Tunnelling Podcast that covered underground farming in Hagerbach, click here and a video explaining the concept can be found here For information about Mission Earth First click hereFor the International Tunnelling Association’s Committee for Underground Space, click here And to learn more about Edge Computing Underground, click here  Supporters The Amberg Group is a unique knowledge, engineering and technology provider of logistics and infrastructures for smart cities, hubs and networks through innovative combinations of above and underground space usage. Its products and services cover in a digitalized manner the entire life cycle of the infrastructures and all engineering and technology aspects. ACO is the leading supplier for drainage solutions in the building industry. Drainage Solutions for the tunnelling industry is one of the core competencies of ACO. The combination of unique materials with the ACO safety concept for tunnels offers the optimal solution for every project. The prefabricated systems are built to the individual design of every project and ensures an easy and fast installation.The post #112 Hagerbach: The Bat Cave of Tunnelling first appeared on Engineering Matters.

Episode metadata supplied by the publisher feed · Published Jun 17, 2021

Embed this episode

NOW PLAYING

#112 Hagerbach: The Bat Cave of Tunnelling

0:00 31:53

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Engineering Matters?

This episode is 31 minutes long.

When was this Engineering Matters episode published?

This episode was published on June 17, 2021.

Can I download this Engineering Matters episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!