EPISODE · Jun 6, 2021 · 1H 3M
114. Trucking - W Memphis Bridge Closed Indefinitely Due To Crack Found In I Beam
from Julia’s Trucking Cafe · host Julia W.
In this episode I discuss how bridge inspectors found a crack in a structural I-beam in a West Memphis bridge that crosses the Mississippi River. This bridge is used extensively by heavy commercial tr
Embed this episode
NOW PLAYING
114. Trucking - W Memphis Bridge Closed Indefinitely Due To Crack Found In I Beam
0:00
1:03:50
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Julia’s Trucking Cafe?
This episode is 1 hour and 3 minutes long.
When was this Julia’s Trucking Cafe episode published?
This episode was published on June 6, 2021.
Can I download this Julia’s Trucking Cafe episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!