116. Behind Schedule? What to Do and How to Prevent It in the Future episode artwork

EPISODE · Feb 5, 2024 · 32 MIN

116. Behind Schedule? What to Do and How to Prevent It in the Future

from Secondary Science Simplified™ · host Rebecca Joyner, High School Science Teacher

No matter what subject or grade you teach or how long you’ve been teaching, you have been behind schedule at least at one point in your career. Trust me, I’ve been there, and it is stressful! Especially if you have an end-of-year test that you’re preparing for. But instead of feeling overwhelmed, in today’s episode, I’m sharing ways to assess why you’re behind schedule and providing practical ways to prevent it from happening in the future. When we start to get behind schedule, our natural reaction is to either rush students or cut instructional resources. However, I caution you to do either of those, for it can bring down student enthusiasm and change your demeanor as a teacher. Instead, I give you four questions to ask yourself where you can begin to assess why you’re behind, which can be eye-opening to what you find important and how much instructional time you actually have. Then, after assessing, I share practical ways you can get back on track or prevent you from being behind schedule in the future. It’s natural to get behind schedule when you have so much science content to teach, but it’s so important to learn where it’s coming from and how to fix it. So, if you’re struggling to fit all of your content in before a big test or the end of the year, this episode is for you! Resources Mentioned: Free Lab AuditAnatomy of a Class PeriodDownload your FREE Classroom Reset ChallengeSend me a DM on Instagram: @its.not.rocket.scienceSend me an email: [email protected], rate, and review on Apple PodcastsShow Notes: https://itsnotrocketscienceclassroom.com/episode116

Episode metadata supplied by the publisher feed · Published Feb 5, 2024

Embed this episode

No matter what subject or grade you teach or how long you’ve been teaching, you have been behind schedule at least at one point in your career. Trust me, I’ve been there, and it is stressful! Especially if you have an end-of-year test that you’re preparing for. But instead of feeling overwhelmed, in today’s episode, I’m sharing ways to assess why you’re behind schedule and providing practical ways to prevent it from happening in the future. When we start to get behind schedule, our natural ...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

116. Behind Schedule? What to Do and How to Prevent It in the Future

0:00 32:00

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Secondary Science Simplified™?

This episode is 32 minutes long.

When was this Secondary Science Simplified™ episode published?

This episode was published on February 5, 2024.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Secondary Science Simplified™ episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!