EPISODE · Apr 19, 2023 · 44 MIN
126: Smart Motorways, Staffing Issues and Heat Pumps
from Re:Construction · host The Construction Index
Bishop & Taylor discuss the cancellation of the smart motorways programme, Billington’s recruitment difficulties, GMI’s shadow board and heat pumps.
Embed this episode
NOW PLAYING
126: Smart Motorways, Staffing Issues and Heat Pumps
0:00
44:52
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Re:Construction?
This episode is 44 minutes long.
When was this Re:Construction episode published?
This episode was published on April 19, 2023.
Can I download this Re:Construction episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!