EPISODE · Jul 11, 2022 · 6 MIN
1301: Powersavers with Adrian Luke from DMS Energy
from Breakfast with Leigh Kenworthy · host Breakfast with Leigh Kenworthy
Adrian has details on a new manufacturing plant being built in Queensland with the potential to deliver 20% of Australia's renewable energy storage needs.
Embed this episode
Ready to play
1301: Powersavers with Adrian Luke from DMS Energy
0:00
6:01
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Breakfast with Leigh Kenworthy?
This episode is 6 minutes long.
When was this Breakfast with Leigh Kenworthy episode published?
This episode was published on July 11, 2022.
Can I download this Breakfast with Leigh Kenworthy episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!