EPISODE · Jul 11, 2022 · 6 MIN
1301: Powersavers with Adrian Luke from DMS Energy
from Breakfast with Leigh Kenworthy · host Breakfast with Leigh Kenworthy
Adrian has details on a new manufacturing plant being built in Queensland with the potential to deliver 20% of Australia's renewable energy storage needs.
Embed this episode
NOW PLAYING
1301: Powersavers with Adrian Luke from DMS Energy
0:00
6:01
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Breakfast with Leigh Kenworthy?
This episode is 6 minutes long.
When was this Breakfast with Leigh Kenworthy episode published?
This episode was published on July 11, 2022.
Can I download this Breakfast with Leigh Kenworthy episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!