Skip to content
1377: A New Dawn for Gumeracha episode artwork

Jun 18, 2021 6 min

1377: A New Dawn for Gumeracha

from SA Today with Jennie Lenman Hosted by SA Today with Jennie Lenman

The main street of Gumeracha is about to look more spectacular as 55 stobie polls and 1.4 km of powerlines come down, following the recent installation of underground powerlines. A new stormwater system is also being installed from next week, which should take between 6 and 8 weeks to complete. The Gumeracha Main Street Project has been a major collaborative effort of the local community and the Adelaide Hills Council over the past five years. Acting Chair Joel Taggart joins Jennie Lenman in this podcast to talk about it. Listen via the play window below and read more on the story here.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

1377: A New Dawn for Gumeracha

0:00 6:07

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of SA Today with Jennie Lenman?

This episode is 6 minutes long.

When was this SA Today with Jennie Lenman episode published?

This episode was published on June 18, 2021.

Can I download this SA Today with Jennie Lenman episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.