#14: Jake Jurewicz of Blue Energy | Prefab Nuclear and the Path to Project Finance episode artwork

EPISODE · May 14, 2026 · 46 MIN

#14: Jake Jurewicz of Blue Energy | Prefab Nuclear and the Path to Project Finance

from Nuclear Investing Podcast · host Brennan Moore

What if the key to scaling nuclear isn't a new reactor design — it's rethinking how you build them? Jake Jurewicz, co-founder and CEO of Blue Energy, joins Brennan Moore and Andrew Meehan to break down how prefabricating nuclear plants in shipyards — borrowing from the LNG and offshore oil and gas playbook — could cut construction timelines in half, eliminate the traveling circus problem, and finally make new nuclear projects financeable with private capital.

Episode metadata supplied by the publisher feed · Published May 14, 2026

Embed this episode

Ready to play

#14: Jake Jurewicz of Blue Energy | Prefab Nuclear and the Path to Project Finance

0:00 46:22

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Nuclear Investing Podcast?

This episode is 46 minutes long.

When was this Nuclear Investing Podcast episode published?

This episode was published on May 14, 2026.

Can I download this Nuclear Investing Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!