EPISODE · Jan 6, 2022 · 36 MIN
#144 Enhancing an Estuary, Restoring a River
from Engineering Matters
In this first episode of the New Year, we are telling a story about renewal. A project in 1950s New Zealand called the Kaituna Cut re-diverted a river, draining wetlands to create pasture. But working against nature can have negative consequences. The process caused the Maketū estuary to silt, and biodiversity to crash. Now, following...
Embed this episode
Ready to play
#144 Enhancing an Estuary, Restoring a River
0:00
36:12
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Engineering Matters?
This episode is 36 minutes long.
When was this Engineering Matters episode published?
This episode was published on January 6, 2022.
Can I download this Engineering Matters episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!