189 - STS-92 - Over and Under (Z1 and PMA-3) episode artwork

EPISODE · Jun 22, 2024 · 1H 1M

189 - STS-92 - Over and Under (Z1 and PMA-3)

from The Space Above Us

After a long wait for the crew (and audience!) STS-92 is finally here. We'll be delivering the heart of the ISS external structure, the Z1 truss, as well as a new docking port, PMA-3. Along the way we'll learn a bit about the folks on the ground who make this all possible, walk through four complicated EVAs, see something no one's seen since 1967, and put our plumber's hats on. Show notes: https://thespaceabove.us/episodes/ep189_sts-92 The Space Above Us website: https://thespaceabove.us Support the show: https://thespaceabove.us/donate TSAU Patreon: https://patreon.com/thespaceabove.us

Episode metadata supplied by the publisher feed · Published Jun 22, 2024

Embed this episode

NOW PLAYING

189 - STS-92 - Over and Under (Z1 and PMA-3)

0:00 1:01:23

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Space Above Us?

This episode is 1 hour and 1 minute long.

When was this The Space Above Us episode published?

This episode was published on June 22, 2024.

Can I download this The Space Above Us episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!