#194 Nuclear Power Connections episode artwork

EPISODE · Dec 15, 2022 · 40 MIN

#194 Nuclear Power Connections

from Engineering Matters

The UK government recently confirmed its support for Sizewell C. Getting to this point, and planning how thousands of construction crew and millions of tonnes of materials and plant will get to the site, has taken a decade of work.  Nuclear power plants like Sizewell C are almost always built in rural locations, by the...

Episode metadata supplied by the publisher feed · Published Dec 15, 2022

Embed this episode

Ready to play

#194 Nuclear Power Connections

0:00 40:23

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Engineering Matters?

This episode is 40 minutes long.

When was this Engineering Matters episode published?

This episode was published on December 15, 2022.

Can I download this Engineering Matters episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!