Skip to content
1963, with Andy Byford and Peter Cipriano episode artwork

Jul 2, 2026 58 min

1963, with Andy Byford and Peter Cipriano

from What's The [DATA] Point Hosted by Citizens Budget Commission

1963 was the year the original Penn Station began to be demolished. To many, it was a tragedy, demonstrating how steep the cost of progress can be. While the station that rose in its stead has in many ways exceeded expectations, it's past time for an overhaul. With the site's political and infrastructural constraints, finding a workable solution hasn't been easy, but a new one has emerged to lead the pack, steered by Andy "Train Daddy" Byford and Master Developer (and former CBC fellow) Peter Cipriano. Listen in.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

1963, with Andy Byford and Peter Cipriano

0:00 58:20

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of What's The [DATA] Point?

This episode is 58 minutes long.

When was this What's The [DATA] Point episode published?

This episode was published on July 2, 2026.

Can I download this What's The [DATA] Point episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.